Home NATIONAL NEWSPatel Engineering Declared L1 Bidder for ₹1,593.08 Crore Lower Arun Hydropower Project in Nepal

Patel Engineering Declared L1 Bidder for ₹1,593.08 Crore Lower Arun Hydropower Project in Nepal

by Editor
0 comments
Patel Engineering Declared L1 Bidder for ₹1,593.08 Crore Lower Arun Hydropower Project in Nepal

Patel Engineering Limited (“Company” or “PEL”), a Mumbai-based infrastructure company, is pleased to announce that it has been declared as Lowest Bidder (L1) by SJVN Lower Arun Power Development Company (P) Ltd. (SLPDC), a wholly owned subsidiary of SJVN, for the Lower Arun Hydro-Electric Project (669 MW) Package 2 in the Sankhuwasabha District of Nepal, valued at ₹ 1,593.08 Crores (inclusive of VAT).

The Package-2 encompasses the execution of critical civil and hydro-mechanical works integral to the Lower Arun Hydro-Electric Project. This includes the construction of Adit-5 and Adit-6 leading to the Head Race Tunnel, as well as the Part Head Race Tunnel itself, measuring 10.5 meters in diameter and extending 5.41 kilometers. The scope further covers the Surge Shaft and its gates, the Pressure Shaft along with the Butterfly Valve Chamber and Access Adit, and the Power House, Switchyard, Surface Pothead Yard, and Tail Race Channel. Additionally, the package involves the installation of steel liners for the Pressure Shafts, Draft Tube Gates, and hoists, and the completion of associated road works and supporting infrastructure. Together, these components form the backbone of the project, ensuring efficient water conveyance, energy generation, and long-term operational reliability.

The project is scheduled to be completed within 54 months, and the site is strategically located near Tumlingtar in Sankhuwasabha District of Nepal, approximately 264 km from Siliguri, India.

Commenting on the development, Ms. Kavita Shirvairkar, Managing Director, Patel Engineering, said: “We are pleased to begin Q1 FY27 on a positive note, having been declared L1 for this important order of approximately ₹1600 Crores. Nepal holds immense hydroelectric potential, and the Lower Arun project is a significant step toward harnessing that energy for sustainable growth. For Patel Engineering Ltd., this award is not just about building infrastructure – it is about contributing to Nepal’s vision of energy independence and regional prosperity. With our ongoing work at the Arun-3 Hydropower project just about 35 kms away from the Lower Arun Site and our proven track record across India, we are committed to bringing world-class engineering and timely execution to Lower Arun, ensuring it becomes a benchmark for development in the region.”

You may also like

Leave a Comment