Pace Digitek Limited has announced a significant milestone in its energy storage business, with its subsidiary, Lineage Power Private Limited, delivering and supporting the deployment of 178 containerized Battery Energy Storage System (BESS) units as of March 31, 2026.
The milestone follows the operationalization of approximately 2.5 GWh of manufacturing capacity at the company’s BESS facility in October 2025. Within six months, the company aligned its production with ongoing project execution, successfully deploying systems across utility-scale projects while also supplying to select private sector clients.
Lineage Power Private Limited (LPPL) serves as the dedicated manufacturing arm of Pace Digitek’s energy platform, playing a central role in advancing the company’s BESS product development and integration capabilities.
Pace Digitek has established integrated capabilities across the BESS value chain, encompassing end-to-end system design and execution. These include cell-to-containerized grid-scale system integration, in-house development of pack, rack, and container systems, and advanced power electronics integration such as Power Conversion Systems (PCS) and grid synchronization technologies. The company also offers energy management systems supported by cloud-based monitoring platforms, along with full-scale system integration, commissioning, and project execution services.
The company is currently executing multiple projects for central and state agencies, in addition to private sector customers, with deployments spread across various locations. Its manufacturing platform is designed to support both project execution and product supply requirements.
With operational manufacturing capacity and active project deployment, Pace Digitek continues to strengthen its position as an integrated player in the energy storage sector, spanning manufacturing, EPC services, and large-scale BESS deployment.

