BREAKING NEWS

Lockdown constraints amid second wave of Covid-19 a downside risk for electricity demand: ICRA

Lockdown constraints amid second wave of Covid-19 a downside risk for electricity demand: ICRA

Electrical Mirror

ANDRITZ to undertake the electromechanical works for Gandhisagar pumped storage project, India

15 Oct 2022

 International technology group ANDRITZ received an order from Greenko MP01 IREP Private Limited, for the electrommechanical works of the Gandhisagar Pumped Storage project (1440 MW) located in Kheemla block village in Neemuch district in Madhya Pradesh, India. The project envisages utilizing existing Gandhi Sagar reservoir as lower reservoir and construction of an upper reservoir.

Greenko, one of India’s leading Renewable Energy companies is committed towards transforming renewable energy from real-time energy to a dispatchable and controlled medium, through digitization and storage solutions to support the economy-wide shift towards a carbon-neutral electricity mix in India.The contract includes design, manufacture, supply, transportation, erection, testing, and commissioning of five 240-MW units, two 120-MW reversible pump units, main inlet valves, and associated auxiliaries.

The works will be undertaken by ANDRITZ’s multiple locations led by its Indian subsidiary with state-of-the-art manufacturing facilities in India. Greenko has again reposed faith in ANDRITZ due to its execution excellence with the second contract after having awarded Pinnapuram PSP earlier in 2020.This order not only confirms once again ANDRITZ’s strong position in the Indian hydro market, but also for pumped storage technology, which plays an important role in providing grid stability to cope with volatile solar and wind power supplies.

leave your comment

stay connected

4400+

Followers

2600+

Followers

5500+

Followers

1000+

Subscribers